A joint venture of Strabag, Züblin and Dywidag has signed a contract with Serbia’s roads authority to build a bridge over the Sava River.

The 1,964m-long bridge near Ostruznica is part of the Belgrade bypass project. It will cost US$31.5m to build and the work is due to take 26 months.

The contract also includes associated road works, lighting, telecoms and landscaping as well as stormwater drainage and treatment.